Quality

What we can prove

ISO 9001:2015, PED 2014/68/EU and AD 2000 W0 are in place, dimension and pressure test report is provided when needed.

Inspection

Checked beside the machine that cut it

Critical features are checked on every piece, at the machine that cut it — sealing areas, mating bores, and any dimension the drawing marks as key. Before dispatch, a percentage of the run is inspected against the drawing, and the report goes with the parts.

A CMM operator at the control station, the probe over the granite table, the measurement program open on screen
CMM station · the same drawing the part was cut to

Documentation

What lands in the box

A shipment is not finished when the last part is packed. Every lot leaves with the file below, indexed by heat number, so a valve body delivered this year can still be traced five years from now.

Customers who run their own incoming inspection get the same file as PDF.

A finished tube held against the flat probe of a bench gauge, the reading taken off before the report is written
Bench reading · the number behind the report
Standard document pack
Material certificateEN 10204 3.1
Dimensional reportper drawing, critical areas
Pressure test chartper serial
First articleFAI on request
NDE reportsRT when specified
Surface & hardnessper drawing
Packing listcarton / pallet level

Files are archived for five years and re-issued on request — a drawing revision or a customer audit is answered from the same folder.

Non-conformance

When a part is wrong

A rejection is answered inside 48 hours — containment first, root cause second. The immediate question is always whether the rest of the batch is affected, and that answer should not wait for the full investigation.

  1. Acknowledge in 24 hoursPhoto, measurement and serial number recorded against your complaint.
  2. Contain in 48 hoursStock, work in progress and transit quantity checked; suspect parts held.
  3. Root causeWritten against the process, not against the operator.
  4. Replace or creditAgreed before the report closes — you are not waiting on the paperwork.

The corrective action is written into the process sheet, so the same feature on the next order starts from the corrected route.

Two inspectors measuring a machined block with a digital height gauge at the inspection bench, the printed inspection sheet behind them
Non-conformance · measured before it is argued
  • Phone · WhatsApp · WeChat+86 189 2112 6996
  • HoursMon–Sat · 08:30–18:00 (GMT+8)
  • ReplyQuote within 48 hours

Certificates on request · Third-party witness welcome · MOQ 1 pc

LOUVER MACHINING
Wuxi Louver Machinery Manufacturing Co., Ltd
No. 10 Huan Zhen North Road, Yangshi, Luoshe Town,
Huishan District, Wuxi, Jiangsu, China 214154
info@louvermachining.com WhatsApp +86 189 2112 6996
WeChat +86 189 2112 6996
Mon–Sat 08:30–18:00 (GMT+8)